Tuesday, December 22, 2009

Floors and kitchen

Pc210002

Bamboo floor is 2/3 installed on the main floor. They did enough to support getting the kitchen cabinets in today. We love how it looks, but the flooring is a little softer than we expected. This just means that we will have to be more careful and try not to scratch or damage it.

 Img_4099

Shot of the island and upper cabinets. The far left is for the refrigerator, the next opening is for the oven and the little one on the far right is the microwave. Needless to say, we are VERY excited.

Img_4101

From the other angle – this wall portion will also have a countertop area to allow passing dishes from dining table to sink or as a serving area.

Now, we need to finalize the countertops and get them ordered. The appliances are still about 2 weeks away.

5 comments:

  1. Progress!! Merry Christmas to you and your family, Shirley.
    Susan

    ReplyDelete
  2. It looks great! What a great Christmas present. I hope your Christmas is merry and filled with God's loving presence!

    ReplyDelete
  3. So exciting! I love the wall color and the cabinets and everything!!! Yes, yes, yes!!!

    ReplyDelete
  4. Wow, it's looking really great! How wonderful to be getting your kitchen cabinets in!

    Are you still using Windows Live Writer? I ask because your pictures are nice and big. I liked WLW except that it made my pictures so small.

    ReplyDelete
  5. ooooh LOVE it!!! I love the color of the island in contrast to the cabinets. I can't wait to see the final product.

    I love the view of your home from the opposite hills

    ReplyDelete

Thanks for leaving a comment! They are so much fun to read.